The Lodge project got off the ground when JEB came into camp to give me a had. the first big job was to clean everything out of the building except for the pool and Foosball tables. The next job was to put the finish on the walls and ceiling. The east and west part of the building was squared out for alignment. Then we started laying the Oak in the pool table end, the worst part was laying the floor under the pool table. The west side was next, with no obstructions to face. The center part was challenging, cutting the angle for the joint of the flooring in the doorways. Teh job was finally completed with the back door area. Due to the cold weather the varnishing was put off till next spring when the weather warms up.
Dock Repair
-
*Over the last few years with ice out and high water the dock has been on
shore ~ pulled away from shore ~~ and has had the water to the top of the
dock ~...
14 years ago
No comments:
Post a Comment