The shower building had a complete face lift. the outside was stained and the window was painted
The insid of the building was gutted, walls and ceiling were insulated, new flooring, pine pannel, shower stall, sink, mirror and coat hooks were installed.
THe hot water tank was removed and reinstalled in a cabinet on the outside of the shower building, this adds more space and controlls the
hot water temperature.
No comments:
Post a Comment